mikef32
Feb 11, 2011, 06:49 AM
Pumping main sewer. Our 225mm steel sewer main is to have a tee inserted and we have excavated and found a nylon sleeve around the pipe. Prior to cutting into the pipe I would ask what would be the need for such?
View Full Version : Why would steel sewer pipe be lined with a nylon sleeve on the outer side?