We have a building with two separate office suites, but only one meter and remote one sub panel. The meter and feed is 3 phase, 5 big wires to the one panel through a 2.25 inch underground conduit. There is room for another meter in the meter box in the pedestal.
Can we run two meters and two single phase 100 amp circuits using the existing 5 wires? And get both 240 v. and 120v.