PDA

View Full Version : Bathroom Repair


calison01
Jul 2, 2010, 04:31 AM
I'm giving an estimate on a bathroom repair. Problem, side and back wall concrete, she do not want to drywall front wall drywall and is at an angle that leaves tub an 1/4 inch from wall. She want it tile and the tile that's on the wall stop at about 1 inch from tub. How or what would you do with the 1 inch? Calvin @ <a href=http://www.tilecuttingsawsite.com/">Cutting Saw</a>

creahands
Jul 2, 2010, 08:15 AM
Wall should be shimmed so that the concrete board (wonderboard) will cover lip on tub. Should not use s/r in wet areas. Tile on concrete board after sealing seams and corners. Stop concrete board below top of tile and finish above with green board.

Chuck