lee12
Jun 28, 2010, 06:21 AM
Building an addition with full basement and would be interested to get some feedback about the foundation drainage system. Here is what is planned.
http://i566.photobucket.com/albums/ss102/leee12/drainage.jpg
It is an 8" masonry construction for a general use basement (not finished). The drain pipe will tie into the current drain pipe around the existing house (I assume this drains to daylight somewhere, I do not have a sump system). Pipe will be at least 6" below the top of basement slab. Clay type soil. The drainage stone quoted for the job is 2B modified but this could be changed. Really appreciate any comments, thanks.
http://i566.photobucket.com/albums/ss102/leee12/drainage.jpg
It is an 8" masonry construction for a general use basement (not finished). The drain pipe will tie into the current drain pipe around the existing house (I assume this drains to daylight somewhere, I do not have a sump system). Pipe will be at least 6" below the top of basement slab. Clay type soil. The drainage stone quoted for the job is 2B modified but this could be changed. Really appreciate any comments, thanks.