theo827
Dec 8, 2006, 06:12 AM
Just ripped up the floor of my second bath to replace all the pipes. The bath is on the first floor sitting on a concrete slab. In other words I have no basement and had to jack hammer and break up the concrete in order to replace the pipes. All pipes are roughed and the sand/dirt is back in place. Now I have to pour the concrete. The area is about 3x4 and about 4 inches thick. I was planning on using quick-crete with gravel. Other than that is there anything else I need to do? Should this be enough? Do I need to worry about water or cracks? In other words am I missing anything? :eek:
Many Thanks