Hi,
I am planning to turn the half bathroom into a full bath in my basement. The floor is concrete. I've attached a jpg to illustrate the layout of the fixtures and septic. I was hoping to get some advice as to...
... which drain line to tie into
And
... the best position in which to orient the tub drain (ie close to the cinder block wall or away from it).
Your advice will be much appreciated. In fact, taking my jpeg, drawing over it, and posting it in a reply would be a plus!
Any other information about the access panel or box I need to make around the drain would be welcome.
Thanks for your time,
Joe
(all of the walls, save for the cinder block wall, are open and accessible)
Also... if you have any pointers as to which direction the pipes run from the existing drains, that'd be great. This way when I go searching, I can make more than just my best guess but one that comes from those more expierienced
I am planning to turn the half bathroom into a full bath in my basement. The floor is concrete. I've attached a jpg to illustrate the layout of the fixtures and septic. I was hoping to get some advice as to...
... which drain line to tie into
And
... the best position in which to orient the tub drain (ie close to the cinder block wall or away from it).
Your advice will be much appreciated. In fact, taking my jpeg, drawing over it, and posting it in a reply would be a plus!
Any other information about the access panel or box I need to make around the drain would be welcome.
Thanks for your time,
Joe
(all of the walls, save for the cinder block wall, are open and accessible)
Also... if you have any pointers as to which direction the pipes run from the existing drains, that'd be great. This way when I go searching, I can make more than just my best guess but one that comes from those more expierienced