sponger
Mar 5, 2010, 09:16 AM
I am hooking up from septic tank to sewer in Florida. I have appx. 180 ft. MOL to the
Riser, which is suppose to be 2 ft. below the grade. I have been told that the fall needs to be 1 in per 10 ft. but I also hear that it is an inch per 4 ft. I also need to know how many cleanouts and where. Plus I need to go under a grade driveway twice. Do I double wall under the drive?
Sponger
Riser, which is suppose to be 2 ft. below the grade. I have been told that the fall needs to be 1 in per 10 ft. but I also hear that it is an inch per 4 ft. I also need to know how many cleanouts and where. Plus I need to go under a grade driveway twice. Do I double wall under the drive?
Sponger