I have a garage that is separated from the house by a breeze way. The breeze way and garage are 6" below the house slab. That puts the front of the breeze way and garage almost below grade. I want to pour a slab over the exsisting slap, both the breeze way and garage. My question is; what is the best or most sound way to handle the concrete that is going to be poured up to the garage wall? Do I nail some 2x6s between the studs on edge flush to the outside of the garage wall creating a "form board", making the breeze way and garage two separate slabs. Or, can I just let the concrete go between the studs and knock out the breeze way and garage at the same time.