While excavating, we realise that the sewer line was running very close to our extension. We thought I would be a good idea to installed a toilet into the room and bathroom too if possible. However the sewer line come just above the top of the slab where we would have joined in to go inside the new room for about 4 metres.
A
|
|
|
|
|
X--------------B--------------------------C
The above drawing shows A Existing upper toilet. X is inside the new room where the new toilet will be. B is where we want to join into the sewer line. From X to B there is about 4 to 4.5 metres. Point B is where we are just above the slab level.
From B to C there is about 8 metres with a drop of about 300mm.
If we could drop point B by 200mm we will then be below the slab level. If we could have a fall of 50mm from X to B we will propably be OK.
Is the 50mm drop from X to B and 100mm drop from B to C OK. Or do you have a better suggestion?
Regards Nicolas
A
|
|
|
|
|
X--------------B--------------------------C
The above drawing shows A Existing upper toilet. X is inside the new room where the new toilet will be. B is where we want to join into the sewer line. From X to B there is about 4 to 4.5 metres. Point B is where we are just above the slab level.
From B to C there is about 8 metres with a drop of about 300mm.
If we could drop point B by 200mm we will then be below the slab level. If we could have a fall of 50mm from X to B we will propably be OK.
Is the 50mm drop from X to B and 100mm drop from B to C OK. Or do you have a better suggestion?