joebop
Nov 7, 2006, 06:53 PM
Renovating the bathroom. The crawl space reveals an 8" plastic c/o connected to the toilet flange, That empties into the main cast iron drain. Should I leave it this size? Or, modify to a common size.
Thanks.
Thanks.
View Full Version : Toilet clean out modification