I am building a concrete home, and need to fill and compact about 4 feet of soil before poring the floor. I will use a jumping jack compactor. How much moisture and how deep should each layer be before compacting?

smearcase
Aug 4, 2009, 04:55 AM
Specifications for manual tampers fill usually require no more than six inch (measured loose) lifts. Moisture content varies with the type of soil.
Your application is very critical. I would recommend that you have a professional soil testing company approve the fill material and perform compaction testing. They will determine the optimum moisture content as part of the process.

hkstroud
Aug 4, 2009, 04:56 AM
You need a engineering firm and soil testing for moisture and composition. And a lot bigger equipment. Unless you are building an extremely small home you won't live long enough to move into it with this approach.