retiring2texas
Jul 30, 2009, 05:31 AM
I am a DIYer.
I did the rough-in for our guest house outbuilding. Concrete slab.
For the centerdrain tub I used a tub-box.
It worked out OK I guess.
I then tiled over the bathroom floor and the stub-out.
Now we are getting ready to do the main house concrete slab which will also have a tub.
Do I HAVE to use a tub-box or can I just make the trap and leave the stub out poking up extra long for the pour? Then later cut it to proper height when the tub is installed?
I did the rough-in for our guest house outbuilding. Concrete slab.
For the centerdrain tub I used a tub-box.
It worked out OK I guess.
I then tiled over the bathroom floor and the stub-out.
Now we are getting ready to do the main house concrete slab which will also have a tub.
Do I HAVE to use a tub-box or can I just make the trap and leave the stub out poking up extra long for the pour? Then later cut it to proper height when the tub is installed?