Hello,
I'm starting a project to hook-up a optional stand-by generator. I have all the wiring for the transfer switch, service panel & essential sub. I need to run about 25 feet of 6/3 from the transfer switch to an outside wall along with a 14/2 (A/C power to the battery charger) and two 18 wires for the start control circuit. I can run standard romex for the 6/3 and 14/2 and appropriate cable for the two-wire start (most likely a 6/8 conductor 18 cable).
I obviously need to bring this outside to the gen-set. My plan is to use a LB to 1 1/4 or 1/12 liquid-tight(LT) (max 6 feet). Straight LT connection from the PVC LB to the LT and then a 90 deg LT fitting to the generator.
How do I make the transition from inside to outside wiring? I'll be connecting the LB to PVC conduit to penetrate the wall and then go into a large junction box. Can I then splice the romex to the THWN I plan to run in the Liquid Tight in that junction box? I've seen some "pre-wire" kits that run the romex right out to the gen-set, I suppose this is allowed because the whole assembly is listed.
I'd like to hear some feedback about the right/safe way to do this.
Thanks
I'm starting a project to hook-up a optional stand-by generator. I have all the wiring for the transfer switch, service panel & essential sub. I need to run about 25 feet of 6/3 from the transfer switch to an outside wall along with a 14/2 (A/C power to the battery charger) and two 18 wires for the start control circuit. I can run standard romex for the 6/3 and 14/2 and appropriate cable for the two-wire start (most likely a 6/8 conductor 18 cable).
I obviously need to bring this outside to the gen-set. My plan is to use a LB to 1 1/4 or 1/12 liquid-tight(LT) (max 6 feet). Straight LT connection from the PVC LB to the LT and then a 90 deg LT fitting to the generator.
How do I make the transition from inside to outside wiring? I'll be connecting the LB to PVC conduit to penetrate the wall and then go into a large junction box. Can I then splice the romex to the THWN I plan to run in the Liquid Tight in that junction box? I've seen some "pre-wire" kits that run the romex right out to the gen-set, I suppose this is allowed because the whole assembly is listed.
I'd like to hear some feedback about the right/safe way to do this.
Thanks