My 10X12 storage building sets on concrete piers that set directly on the ground. My floor is sagging one and a half inches on one side and two and a half inches on the other, with a developing noticeable hump in the middle. I want to jack the sides up and add additional support. How do I go about doing this and hopefully avoid future sagging, thanks?

ballengerb1
Jul 4, 2009, 02:46 PM
Did the piers settle or were there too few so the joists sagged? A standard automotive bottle or scissors jack can lift this weight.

creahands
Jul 5, 2009, 03:07 AM
Can u give us a picture?

Give more detail from piers to floor.

Metal or wood shed?

The leveling method changes according to type of floor joist u have.

Chuck

lbowlds
Jul 6, 2009, 09:24 AM
Did the piers settle or were there too few so the joists sagged? A standard automotive bottle or scissors jack can lift this weight.

The piers have settled, one on each corner and one in the middle.

lbowlds
Jul 6, 2009, 09:27 AM
can u give us a picture?

Give more detail from piers to floor.

metal or wood shed?

The leveling method changes according to type of floor joist u have.

Chuck

It's a wood structure, standard framing, floor sets on piers on each corner and one in the middle. Floor is joist on piers with three quarter plywood subfloor. Piers set directly on ground.

creahands
Jul 6, 2009, 11:45 AM
Piers should be set below frost line in order for structure to minimize movement.

What is ground condition? Wet or soft? What is size of floor joist?

The 5 piers should be enough for this size shed.