stevetcg
Jun 6, 2009, 04:26 AM
We are about to rip out carpet and install a few hundred (this round) ft2 of hardwood flooring.
What is considered the "correct" way to edge? Do we pull out the wood baseboards, install the floor under them and reinstall with or without 1/4 round? Do we just butt the flooring up to the existing baseboard and put in the 1/4 round?
Also, the hardwood we bought says it can be glued, nailed or float. We are installing on the second floor over a good plywood subfloor. Is nailing the best?
Thanks for the last minute advice and wish me luck. If this goes well, I have another 1500 ft2 to do. :)
What is considered the "correct" way to edge? Do we pull out the wood baseboards, install the floor under them and reinstall with or without 1/4 round? Do we just butt the flooring up to the existing baseboard and put in the 1/4 round?
Also, the hardwood we bought says it can be glued, nailed or float. We are installing on the second floor over a good plywood subfloor. Is nailing the best?
Thanks for the last minute advice and wish me luck. If this goes well, I have another 1500 ft2 to do. :)