Jan 14, 2009, 04:53 PM
Hi there, I am in the process of installing a basement bathroom on a septic system. I have already broke though the concrete for my drain lines and installed a sewage tank about 3 feet deep. After leaving the job for a couple days, I returned to find my basin floating in the hole I dug for it. It seems that I hit the water table or there is excess water under their slab. A sump pit that is located some 30 feet away on the other side of the basement seems to be level with the water that has filled into the hole I dug for my sewage basin. The water is now about 6 inches from the top of the pit.
What is the best solution for taking care of the excess water so I can safely install my tank without worrying about it floating up through the concrete after a couple months. I should mention that the ground is hard clay. Should I install a second sump pit that is deeper the sewage tank?
Thanks in advance
Jeff
What is the best solution for taking care of the excess water so I can safely install my tank without worrying about it floating up through the concrete after a couple months. I should mention that the ground is hard clay. Should I install a second sump pit that is deeper the sewage tank?
Thanks in advance
Jeff