Oct 7, 2008, 07:04 AM
Can I run my wires under the joist (perpendicular to joist), rather than drilling
Holes in the joist, in an open ceiling basement (ceiling has no sheetrock).
The basement ceiling is 7.5 ft high, and it's insulated with fiberglass insulation)?
My concern is there are way too many holes in our existing joist that builder has done for
Plumbing, sewer and original electrical work.
If yes, I have the following questions:
1- how many wires can it be run at one place under and perpendicular to joist?
2- is there a limit on the current they will be carrying? For example,
Can the wires be carrying 12Amp, 50Amp, 100Amp, etc. and be
Several of them in one location (see question 3).
3- can I run wires in groups, and have several of these groups in different
Locations all over the basement ceiling under and perpendicular to joist?
This way it may look neat and it may save some wires too.
4- the joists are 16 inch centered, what should be the stapling pattern?
(For example, should it be staple every other joist, or staple every joist?)
I know code is every 4 feet.
Thank you in advance
Holes in the joist, in an open ceiling basement (ceiling has no sheetrock).
The basement ceiling is 7.5 ft high, and it's insulated with fiberglass insulation)?
My concern is there are way too many holes in our existing joist that builder has done for
Plumbing, sewer and original electrical work.
If yes, I have the following questions:
1- how many wires can it be run at one place under and perpendicular to joist?
2- is there a limit on the current they will be carrying? For example,
Can the wires be carrying 12Amp, 50Amp, 100Amp, etc. and be
Several of them in one location (see question 3).
3- can I run wires in groups, and have several of these groups in different
Locations all over the basement ceiling under and perpendicular to joist?
This way it may look neat and it may save some wires too.
4- the joists are 16 inch centered, what should be the stapling pattern?
(For example, should it be staple every other joist, or staple every joist?)
I know code is every 4 feet.
Thank you in advance