gangelo
Oct 6, 2008, 08:03 AM
I am so upset and scared... :(
I worked from 7am to 3am yesterday and this morning putting 1/2" Hardibacker (36" high) along the perimeter of my bathroom walls in preparation of my wall tile; I now realize that I did not hang it according to "the specs".
I was supposed to leave 1/4" between the board and the floor, but I basically laid it right on my subflooring. The other thing I did, was nail the corners anywhere from 1/2" to 3/4" from the seam and the specs say it should have been 2"... I used 2" roofing nails approx 12" apart (specs say 8") and used A LOT of Liquid Nails to adhere the board to my studs...
We are putting in a claw-foot tub; no shower enclosure. The tile on my walls will be set at 42" and 72" on the walls closest to the tub. The framing of my walls are mixed - some studs being original and some new construction.
I guess my question is, am I really looking at my tiled walls being destroyed over time because of this? Also, should I put more nails in at this point being that the tiles are not laid yet? What about nailing more nails with the liquid nails back there?
Thank you for you help in advance...
I worked from 7am to 3am yesterday and this morning putting 1/2" Hardibacker (36" high) along the perimeter of my bathroom walls in preparation of my wall tile; I now realize that I did not hang it according to "the specs".
I was supposed to leave 1/4" between the board and the floor, but I basically laid it right on my subflooring. The other thing I did, was nail the corners anywhere from 1/2" to 3/4" from the seam and the specs say it should have been 2"... I used 2" roofing nails approx 12" apart (specs say 8") and used A LOT of Liquid Nails to adhere the board to my studs...
We are putting in a claw-foot tub; no shower enclosure. The tile on my walls will be set at 42" and 72" on the walls closest to the tub. The framing of my walls are mixed - some studs being original and some new construction.
I guess my question is, am I really looking at my tiled walls being destroyed over time because of this? Also, should I put more nails in at this point being that the tiles are not laid yet? What about nailing more nails with the liquid nails back there?
Thank you for you help in advance...