atticguy
Apr 3, 2006, 05:26 AM
Hey guys, I've been gone awhile and am now back to my project.
I have two 1.5" revent lines going back to my main stack. One is the laundry tub from the basement. The other has been wyed and hosts the kit. sink and the bath tub and sink. I would like to use a 1.5" wye and join them into my main stack as one connection. Should I then immediately convert the 1.5" wye to 3" and then tie in? I guess I wonder if I'm in violation because of my fixture units exceeding capacity for the brief period of the 1.5" wye. That is, until is is expanded to 3". Sorry its fuzzy, its hard to put into words.
Sorry if this sounds stupid, but I want to pass inspection.
Louie
I have two 1.5" revent lines going back to my main stack. One is the laundry tub from the basement. The other has been wyed and hosts the kit. sink and the bath tub and sink. I would like to use a 1.5" wye and join them into my main stack as one connection. Should I then immediately convert the 1.5" wye to 3" and then tie in? I guess I wonder if I'm in violation because of my fixture units exceeding capacity for the brief period of the 1.5" wye. That is, until is is expanded to 3". Sorry its fuzzy, its hard to put into words.
Sorry if this sounds stupid, but I want to pass inspection.
Louie