takabanana
Apr 16, 2008, 08:25 PM
Finishing Basement: Laminate Flooring and Drywall
I'm trying to finish my basement, and had a few questions:
1. I've narrowed down my choice of flooring to be Laminate Flooring (prob get them from SAMs). If I am laying it on top of the concrete slab, can I just lay down a vapor barrier first, then install the laminate on top of that? Anything else? I did not want to make the layer below the laminate too thick because I did not want to lose much height, and I also wanted to keep costs down.
2. The basement is currently just framed out. Which comes first: Installing Drywall on the walls, or installing the flooring (Laminate)? My current assumption is Drywall, Flooring, and then the trim/molding. If so, do I install the Drywall straight down to the floor on the framings, or put some spacing between the floor and the bottom edge of the drywall? How much?
FYI, I did the moisture test: taped pieces of aluminum foil on the floor and on the walls for 48 hours, and found no moisture under them. But I did get some mildew on the underside of my ping-pong table and mold/mildew on fabrics of things left in the unfinished basement (i.e. baby carrier) over 2 years. Since then, I have insulated all the poured concrete walls (3/4 of the perimeter of the basement) with Formular 150s, and 2x4 framing in front of them. I think the vapor barrier on the floor is enough?
Thanks for any input.
I'm trying to finish my basement, and had a few questions:
1. I've narrowed down my choice of flooring to be Laminate Flooring (prob get them from SAMs). If I am laying it on top of the concrete slab, can I just lay down a vapor barrier first, then install the laminate on top of that? Anything else? I did not want to make the layer below the laminate too thick because I did not want to lose much height, and I also wanted to keep costs down.
2. The basement is currently just framed out. Which comes first: Installing Drywall on the walls, or installing the flooring (Laminate)? My current assumption is Drywall, Flooring, and then the trim/molding. If so, do I install the Drywall straight down to the floor on the framings, or put some spacing between the floor and the bottom edge of the drywall? How much?
FYI, I did the moisture test: taped pieces of aluminum foil on the floor and on the walls for 48 hours, and found no moisture under them. But I did get some mildew on the underside of my ping-pong table and mold/mildew on fabrics of things left in the unfinished basement (i.e. baby carrier) over 2 years. Since then, I have insulated all the poured concrete walls (3/4 of the perimeter of the basement) with Formular 150s, and 2x4 framing in front of them. I think the vapor barrier on the floor is enough?
Thanks for any input.