Im about to run my feeder into my new workshop and was wondering when I drill down through the bottom plate and bring in my feeder, what's the codes say about this part of the wire having to be in conduit? I mean the part from the floor up to the bottom of my panel?

Also, is it within code to use plain 12 awg (green) for pigtails on the grounds? I can't find plain copper in 12awg. Probably a stupid question there, but I just wanted to know. LOL

Stratmando
Mar 19, 2008, 04:59 PM
Ground can be green or bare. I would just run Conduit to panel, If PVC You can heat to make an offset, If Metal, you may need a bender.
It can also be solid or stranded.

mr500
Mar 19, 2008, 06:20 PM
Ok PVC it is then