mike08201
Jan 2, 2008, 05:07 AM
I have a 70,000 BTU boiler with currently 3 of 4 zones used.
2 are for heat and 1 is for the hot water coil (the priority zone)
I recently added 2 more zones from an addition I have done. They have kickspace heaters and the FL100 in the floor heaters from Smith Environmental. (I describe them as a radiator in the floor with a blower)
I have done all the plumbing to the boiler but not the hook up yet. I keep looking at the zone controller and wondering how to update it to add more zones.
Any advice on changing it and what I may be getting into is very appreciated.
Mike
2 are for heat and 1 is for the hot water coil (the priority zone)
I recently added 2 more zones from an addition I have done. They have kickspace heaters and the FL100 in the floor heaters from Smith Environmental. (I describe them as a radiator in the floor with a blower)
I have done all the plumbing to the boiler but not the hook up yet. I keep looking at the zone controller and wondering how to update it to add more zones.
Any advice on changing it and what I may be getting into is very appreciated.
Mike