pwd77
Dec 30, 2007, 03:26 PM
I have 1" HDPE water service into the house, Vanguard Proguard black plastic.
Presently there is 3/4" brass nipple inside, held on by two hose clamps. To this is threaded a 3/4" valve followed by 3/4" PEX supply to the house.
I want to change the 3/4" nipple to a 1" barbed fitting to restore the 1" supply to the house.
I have two questions:
1. What is the proper way to remove the nipple? I have been told to warm it with a heat gun to soften the plastic, swap out the fittings, then replace both hose clamps. Is this correct? Any hints? (Water will be shut off at the main.)
2. I plan to run 1" copper or brass from the new fitting and (1") valve, so I can tee copper to the outside, then convert to 1" PEX to supply the house. Any thoughts on using threaded brass vs. soldered copper fittings?
Presently there is 3/4" brass nipple inside, held on by two hose clamps. To this is threaded a 3/4" valve followed by 3/4" PEX supply to the house.
I want to change the 3/4" nipple to a 1" barbed fitting to restore the 1" supply to the house.
I have two questions:
1. What is the proper way to remove the nipple? I have been told to warm it with a heat gun to soften the plastic, swap out the fittings, then replace both hose clamps. Is this correct? Any hints? (Water will be shut off at the main.)
2. I plan to run 1" copper or brass from the new fitting and (1") valve, so I can tee copper to the outside, then convert to 1" PEX to supply the house. Any thoughts on using threaded brass vs. soldered copper fittings?