I live in south africa and just started a plumbing company, I recently installed a 2nd water geyser to a large house just to run there 2nd bathroom what has his/hers basind jacussi and a shower and toilet. The main water supply is 3/4 but reduces to 1/2 straight away and that feeds the rest of the house, I'm worried that by having 2 geysers both 150ltr and probably about 15-16 different connections i.e: 2 showers, 2 baths hoses basins sinks and a maids house that 1/2 piping is going to struggle to supply at a good pressure, would changing to 3/4 be worth while or maybe a pump? As a lot of the piping is run under the house and it concrete flooring.
Also instaling a 2nd geyser is 2 PVR valves required? I have balanced the water supply and installed a PVR to the new geyser, but the original geyser has the valve located at the main water inlet supply outside, do you need to balance both cold water supply
And lastly shower has not great pressure (hot) I used 3/4 copper from the new gesyer and had to reduce to 1/2 when it goes through the wall as this was already plumbed in and the bathrooms have been decorated from the old owner also piping runs under the concrete floor! Would changing the supply to 3/4 increase the pressure I would say the length from were I reduced it to the shower mixer is about 3-4 mtrs they have one of those large shower heads, the Jacussi is the same they used 1/2 (instead of 3/4) so this can only be changed when the decide to redecorate as the mixer is mounted in the wall and there's no trap door on the jacussi.
Hope someone can advise
Cheers Garry
I live in south africa and just started a plumbing company, I recently installed a 2nd water geyser to a large house just to run there 2nd bathroom what has his/hers basind jacussi and a shower and toilet. The main water supply is 3/4 but reduces to 1/2 straight away and that feeds the rest of the house, I'm worried that by having 2 geysers both 150ltr and probably about 15-16 different connections i.e: 2 showers, 2 baths hoses basins sinks and a maids house that 1/2 piping is going to struggle to supply at a good pressure, would changing to 3/4 be worth while or maybe a pump? As a lot of the piping is run under the house and it concrete flooring.
Also instaling a 2nd geyser is 2 PVR valves required? I have balanced the water supply and installed a PVR to the new geyser, but the original geyser has the valve located at the main water inlet supply outside, do you need to balance both cold water supply
And lastly shower has not great pressure (hot) I used 3/4 copper from the new gesyer and had to reduce to 1/2 when it goes through the wall as this was already plumbed in and the bathrooms have been decorated from the old owner also piping runs under the concrete floor! Would changing the supply to 3/4 increase the pressure I would say the length from were I reduced it to the shower mixer is about 3-4 mtrs they have one of those large shower heads, the Jacussi is the same they used 1/2 (instead of 3/4) so this can only be changed when the decide to redecorate as the mixer is mounted in the wall and there's no trap door on the jacussi.
Hope someone can advise
Cheers Garry