JumbleJim
Dec 4, 2007, 02:36 AM
I am installing a toilet in my basement and have set the flange, although I have not yet relayed the concrete. It is an offset flange (for wall spacing issues), which is why I set it first. With it firmly glued, it appears that the bottom of the flange will sit about 1/4" above the floor. will this be too high? from the top of the flange to where the concrete will be is almost 3/4". If I have to redo my work, I can live with it, but would like to know beforehand if what I have will suffice. Any help appreciated :eek:
Ps- I will be laying only vinyl tile for flooring. A section of the concrete (where someone had previously cut into it) is not level, which would make it hard to put a subfloor, and there is a drain in the floor that would be difficult to deal with.
Pps- what would be the ramifications of sealing off the floor drain in my basement?
Ps- I will be laying only vinyl tile for flooring. A section of the concrete (where someone had previously cut into it) is not level, which would make it hard to put a subfloor, and there is a drain in the floor that would be difficult to deal with.
Pps- what would be the ramifications of sealing off the floor drain in my basement?