harfar
Oct 29, 2007, 05:32 PM
I need to move the meter base off my house so it will be much more convenient for me to work on the outside of the house. I want to move the meter base to the utility pole about 90 feet from the house and bury the electrical wires between the house and the pole.
Currently, there are 3 aluminum wires that run from the step-down transformer on the utility pole to the meter base on my house.
A guy from the electric utility said that I need to bury schedule 40 pipe in the ground and use schedule 80 on the verticals, above the ground. He said I then need to buy some special burial wire that comes with 3 wires all bundled together.
I asked him if I could just use the aluminum wire that is already running to the house since I will be burying it inside schedule 40 pipe. He said it would not work because it would not last.
Can someone please tell me the low down? Thanks very much.
Currently, there are 3 aluminum wires that run from the step-down transformer on the utility pole to the meter base on my house.
A guy from the electric utility said that I need to bury schedule 40 pipe in the ground and use schedule 80 on the verticals, above the ground. He said I then need to buy some special burial wire that comes with 3 wires all bundled together.
I asked him if I could just use the aluminum wire that is already running to the house since I will be burying it inside schedule 40 pipe. He said it would not work because it would not last.
Can someone please tell me the low down? Thanks very much.