diceybrew
Jul 23, 2007, 09:37 AM
I'm remodeling my attic and planning to put the toilet about 9 feet from the main stack. It's a straight shot, but the joists (2x8s) run perpendicular to the path of the drain pipe, and what little I know of the code says that you shouldn't bore 2x8s for 3 inch pipe.
One of the solutions I had in mind was to frame a channel through the joists. I would sister the joists outside of the ones that I need to go through, and install double headers between the sistered joists. In the process, I would remove 18 inch sections from the problematic joists, leaving me a nice clean straight channel between the toilet and the main stack.
Any ideas if this would work? I want to be sure of the structural integrity of the plan as I intend to lay a ceramic surface over it all. Any better ideas?
Thanks everyone, Craig
One of the solutions I had in mind was to frame a channel through the joists. I would sister the joists outside of the ones that I need to go through, and install double headers between the sistered joists. In the process, I would remove 18 inch sections from the problematic joists, leaving me a nice clean straight channel between the toilet and the main stack.
Any ideas if this would work? I want to be sure of the structural integrity of the plan as I intend to lay a ceramic surface over it all. Any better ideas?
Thanks everyone, Craig