Upon opening up the wooden subfloor of our (almost) ground level suite, we found that previous owners broke up the concrete floor pad to add sewer pipes to get the right angle. There is exposed earth under the pipe and to one side. The dirt is ever so slightly damp to touch, but there is no water pooling (however, if you touch the earth with a kleenex it will get damp) but the surrounding concrete is dry. Wondering if the strip of bare earth should be filled with concrete or if that is necessary. I have had many conflicting opinions:
- leave and cover with poly (but that might cause mold)
- pour concrete (but the pipe shouldn't be encased in concrete and to do it properly you should rip open under the wall (and kitchen cupboard to get at concealed portion
- don't worry about the dirt, just make sure the outside is sealed
- moisture will always be present because of hydrostatic pressure, regardless of what you do from the outside
Any thoughts before I have the floor closed up?
Thanks!
Cheryl
- leave and cover with poly (but that might cause mold)
- pour concrete (but the pipe shouldn't be encased in concrete and to do it properly you should rip open under the wall (and kitchen cupboard to get at concealed portion
- don't worry about the dirt, just make sure the outside is sealed
- moisture will always be present because of hydrostatic pressure, regardless of what you do from the outside
Any thoughts before I have the floor closed up?
Thanks!