laborpool
Nov 4, 2010, 04:24 AM
I spent 40 min. yesterday cutting vertical drain with a sawsall to clean out pit I'm working in. I'm in a four foot hole under a slab and want to change direction of drain pipe for remodeling from a horizontal connection to vertical.
My last task is to remove 90 degree cast elbow that connects to a vertical pipe that continues to run another foot or two.
Don't want to try and use sawsall again, but only have one crack at this.
What is the safest way to get elbow, lead and oakam out?
My last task is to remove 90 degree cast elbow that connects to a vertical pipe that continues to run another foot or two.
Don't want to try and use sawsall again, but only have one crack at this.
What is the safest way to get elbow, lead and oakam out?