My Friend is refinishing his basement (1100SF). He currently has a 200Amp Service, but the panel does not have enough Spaces. We want to put in a 100 Amp sub panel in the Basement to include:
50Amp- 5 Ton air conditioning
20 Amp- Dedicated Bathroom Circuit
15 Amp- Lighting Circuit
15 Amp- Receps
15 Amp- Receps
15 Amp- Bedroom
My Main question is what size should I Use for the feeders?
According to NEC table 310.15(B)(6) I could use #4's for the Hots and neutral, but I have also read other places that you cannot use this table And need to use table 310.16
If I can use table 310.15(B)(6) I was planning on running 3 #4 (CU), and 1# 8 (CU)
Voltage Drop will not be an issue, the run will be less than 20'.
50Amp- 5 Ton air conditioning
20 Amp- Dedicated Bathroom Circuit
15 Amp- Lighting Circuit
15 Amp- Receps
15 Amp- Receps
15 Amp- Bedroom
My Main question is what size should I Use for the feeders?
According to NEC table 310.15(B)(6) I could use #4's for the Hots and neutral, but I have also read other places that you cannot use this table And need to use table 310.16
If I can use table 310.15(B)(6) I was planning on running 3 #4 (CU), and 1# 8 (CU)
Voltage Drop will not be an issue, the run will be less than 20'.