kimberly600
Aug 11, 2009, 08:53 AM
My first installer did not level the tub in new bathroom, among other things. Once his new tile job was taken down this was discovered, among other things again. Tub had to be pushed back about 3/4 inch, leaving gap on tile floor.
Any ideas on how to fill this gap? Aside from ripping out the tile on the floor in front of tub? I'm looking to finish this 4 month long redo (!) this week.
I've found 1/4 and 3/8 and 1inch quarter round - but none quite fit.
I found a great new contractor - his tile and carpentry work are first rate.
Thanks!
Kim
Any ideas on how to fill this gap? Aside from ripping out the tile on the floor in front of tub? I'm looking to finish this 4 month long redo (!) this week.
I've found 1/4 and 3/8 and 1inch quarter round - but none quite fit.
I found a great new contractor - his tile and carpentry work are first rate.
Thanks!
Kim