sfar7
Feb 22, 2009, 07:51 PM
I finished my plumbing - an addition of a shower drain to a half bath rough in- and poured my concrete today. But I didn't like the idea of leaving 6" of a hole around the new drain pipe for drain assembly though. I foresee(maybe incorrectly) that that type of a gap could cause cracking of the pan eventually since there is no support. So, now I have my 2" stub sticking up 10" or so out of a level concrete floor. Was I wrong? Did I screw up? How can I attach a drain properly given what I'm looking at? I was planning to put some type of foundation mix or plaster into my shower opening before I set my pan(per instruction) Will this give me ths space I need>?
Any help is appreciated.
Any help is appreciated.