Homebrewtoo
Jan 21, 2009, 08:31 AM
The rough-in for my basement shower just has a two-inch stub coming straight up off the main sewer line. I'm also planning on placing the shower about 2 to 3 feet from this original location and moving the sink. I'd like to drain both the shower and the sink into this location. First, can I tee this line and drain the sink and shower here? And second, how should I get the p-trap for the shower in? I was planning to build a cement platform for the shower rather than bust concrete in the basement. Should I set the p-trap in concrete? And how far above the sewer line does the p-trap need to be?
Thanks,
Jeff
Thanks,
Jeff