Dave Ermeling
Oct 20, 2008, 05:38 PM
I'm done with framing, plumbing & electrical rough-in, and drywall so what comes after drywall taping? I still have to paint, put a drop ceiling in a section, door installation, trim and flooring. Also, do I install cabinets in the bar area and bath before flooring or after?
I'm assuming I put down flooring before the toilet flange. Any help would be appreciated.
I'm assuming I put down flooring before the toilet flange. Any help would be appreciated.