banddude
Jun 23, 2008, 09:47 PM
My brother and I are adding a handicap bathroom to the first floor of our parents house. It will be installed on a one story addition my father added. The problem is venting the fixtures. There will be of course a Lav, a toilet and a shower basin in that order toward the soil stack which lies perpendicular and below the new drain run. The new Lav which is the fixture farthest away is about 10 feet from a 4" soil stack.
If we run a tradition vent stack it will come out of the roof in front of a bedroom window. We are to far away from the original vent stack to tie in.
There are currently four fixtures, a kitchen sink and an upstairs bath(lav, tub, toilet).
Do we need a separate vent stack for these new fixtures or can we dry vent?
Thanks
If we run a tradition vent stack it will come out of the roof in front of a bedroom window. We are to far away from the original vent stack to tie in.
There are currently four fixtures, a kitchen sink and an upstairs bath(lav, tub, toilet).
Do we need a separate vent stack for these new fixtures or can we dry vent?
Thanks