Hello, I am putting a new 200AMP main panel in a service upgrade. Its location is a little higher than the meter socket. The panel and the meter are back to back on a wall (meter outside, panel inside). Main disconnect is at the top of the panel, as are the connections for the SEU cable.
Can I make an entry with the SEU cable (3 x 4/0) from the bottom of the panel and run the 3 wires to their connectors at the top? If this is not allowed, can I run the cable on one side of the panel without a conduit, then go up for 4 feet and make an entry from the top right side or from the top of the panel? If none of these are possible what is my option?
Can I make an entry with the SEU cable (3 x 4/0) from the bottom of the panel and run the 3 wires to their connectors at the top? If this is not allowed, can I run the cable on one side of the panel without a conduit, then go up for 4 feet and make an entry from the top right side or from the top of the panel? If none of these are possible what is my option?