Ask Experts Questions for FREE Help!
Answer   ||    Advanced Search

Ask your question or search...
International Sites: Nederlandse experts vragen
User Name 
Password 
Join   Forgot password? 

Home > Home & Garden > Plumbing   »   Rough-in plumbing basement - New House

Question
 
 
#1  
Old Nov 1, 2009, 06:51 PM
kclaw
New Member
kclaw is offline
 
Join Date: Nov 2009
Posts: 4
kclaw See this member's comment history on his/her Profile page.
Rough-in plumbing basement - New House

Hello,

I have been trying to figure out this weekend the best way to run the waste water pipes in my new house. The basement walls are poured, now I just have to do the plumbing before they can pour the floor.

I attached a picture of the layout of the basement, I would appreciate any help with:

1) Where should I run the waste water pipes under the floor to connect everything up?
2) I am really confused about vents, where should I run vents at (if any) from under the concrete floor?

Thanks for any help.

Attached Images
 
Attached Images
File Type: pdf plumbing110109-2.pdf (318.7 KB, 11 views)
Reply With Quote
 
     

Answers
 
 
Old Nov 1, 2009, 07:49 PM   #2  
Home Repair & Remodeling Expert
ballengerb1 is offline
 
ballengerb1's Avatar
 
Join Date: Dec 2006
Location: Wheaton, Illinois, USA
Posts: 15,449
ballengerb1 See this member's comment history on his/her Profile page.ballengerb1 See this member's comment history on his/her Profile page.ballengerb1 See this member's comment history on his/her Profile page.ballengerb1 See this member's comment history on his/her Profile page.ballengerb1 See this member's comment history on his/her Profile page.ballengerb1 See this member's comment history on his/her Profile page.ballengerb1 See this member's comment history on his/her Profile page.ballengerb1 See this member's comment history on his/her Profile page.ballengerb1 See this member's comment history on his/her Profile page.ballengerb1 See this member's comment history on his/her Profile page.
I do not want to assume anything since that layout is not labeled, is it your basement level? I see a 4" drain pipe exiting the building so I will assume your sewer is lower than your floor. I also see where the first floor drain comes down to the basement so I am a little surprised this design leaves out all the rough in which should include a drain for the future litchem.
  Reply With Quote
 
     
 
 
Old Nov 1, 2009, 08:09 PM   #3  
New Member
kclaw is offline
 
Join Date: Nov 2009
Posts: 4
kclaw See this member's comment history on his/her Profile page.
Yes, this the basement.

Probably the reason the rough in for the kitchen is left out is because I designed it and I just threw that in at the last minute thinking about future use.
  Reply With Quote
 
     
 
 
Old Nov 2, 2009, 06:56 AM   #4  
Home Repair & Remodeling Expert
ballengerb1 is offline
 
ballengerb1's Avatar
 
Join Date: Dec 2006
Location: Wheaton, Illinois, USA
Posts: 15,449
ballengerb1 See this member's comment history on his/her Profile page.ballengerb1 See this member's comment history on his/her Profile page.ballengerb1 See this member's comment history on his/her Profile page.ballengerb1 See this member's comment history on his/her Profile page.ballengerb1 See this member's comment history on his/her Profile page.ballengerb1 See this member's comment history on his/her Profile page.ballengerb1 See this member's comment history on his/her Profile page.ballengerb1 See this member's comment history on his/her Profile page.ballengerb1 See this member's comment history on his/her Profile page.ballengerb1 See this member's comment history on his/her Profile page.
Should I also assume you will pull a permit? Call first since your building department may not even allow you to do this work, may require a licensed plumber for rough in.
  Reply With Quote
 
     
 
 
Old Nov 2, 2009, 06:58 AM   #5  
Senior Plumbing Expert
speedball1 is offline
 
speedball1's Avatar
 
Join Date: Jan 2003
Location: Sarasota, Fl.
Posts: 19,005
speedball1 See this member's comment history on his/her Profile page.speedball1 See this member's comment history on his/her Profile page.speedball1 See this member's comment history on his/her Profile page.speedball1 See this member's comment history on his/her Profile page.speedball1 See this member's comment history on his/her Profile page.speedball1 See this member's comment history on his/her Profile page.speedball1 See this member's comment history on his/her Profile page.speedball1 See this member's comment history on his/her Profile page.speedball1 See this member's comment history on his/her Profile page.speedball1 See this member's comment history on his/her Profile page.
Pay to call speedball1 for advice ($.95/min)
Call speedball1 via Skype™
Also ask if your code allow wet vents. Tom
  Reply With Quote
 
     
 
 
Old Nov 2, 2009, 03:51 PM   #6  
New Member
kclaw is offline
 
Join Date: Nov 2009
Posts: 4
kclaw See this member's comment history on his/her Profile page.
It is already permitted, and I do not need a licensed plumber.

Yes, I can use a wet vent. Would a wet vent off the laundry and sink drains be enough or do I need a vent off the tub also?

Thanks
  Reply With Quote
 
     
 
 
Old Nov 2, 2009, 04:02 PM   #7  
Plumbing Expert
massplumber2008 is offline
 
massplumber2008's Avatar
 
Join Date: Jan 2008
Location: Boston, Massachusetts
Posts: 5,478
massplumber2008 See this member's comment history on his/her Profile page.massplumber2008 See this member's comment history on his/her Profile page.massplumber2008 See this member's comment history on his/her Profile page.massplumber2008 See this member's comment history on his/her Profile page.massplumber2008 See this member's comment history on his/her Profile page.
Hi kclaw...

Here is a basic layout for the underground. Give me a couple days and I will try to explode the view to include sizing and venting....O.K.??

Cleanouts will be needed in quite a few places....will explain later.

MARK
Attached Images
 
  Reply With Quote
 
     
 
 
Old Nov 2, 2009, 08:07 PM   #8  
New Member
kclaw is offline
 
Join Date: Nov 2009
Posts: 4
kclaw See this member's comment history on his/her Profile page.
Mark:

That is exactly what I was looking for... Thanks a lot. I will lay it tomorrow.

I would love it if you could expand on the venting also if you get a chance.
  Reply With Quote
 
     
 
 
Old Nov 3, 2009, 05:06 PM   #9  
Plumbing Expert
massplumber2008 is offline
 
massplumber2008's Avatar
 
Join Date: Jan 2008
Location: Boston, Massachusetts
Posts: 5,478
massplumber2008 See this member's comment history on his/her Profile page.massplumber2008 See this member's comment history on his/her Profile page.massplumber2008 See this member's comment history on his/her Profile page.massplumber2008 See this member's comment history on his/her Profile page.massplumber2008 See this member's comment history on his/her Profile page.
Hi Kclaw:

OK...here's a blown up version of the underground drain system. The diagram includes the vents needed for the underground plumbing but it doesn't show how to connect all this together in the basement before taking the main vent from the basement upstairs. Confirm that you understand and ask any questions you need, too. I will post the specifics on connecting all the vents together in the basement after you finish/inspect this...O.K.??

All underground piping must be 2" minimum.

All elbows coming out of the ground must be long sweep elbows.

You must use WYE fittings to branch of the main drain...NO SANITARY TEES underground.

Dandy clean outs (or test tee fittings) must be installed at all fixtures as indicated below. This is especially important with the main drain going upstairs.

The 3"x2" wye at the toilet...picking up the sink and tub...that wye must roll above the center of the toilet drain line. At a minimum, it needs to roll slightly above the center line of the 3" toilet drain pipe. Here, use a 45 degree fitting to straighten out the angle of the rolled wye fitting so that the 2" pipe that picks up the tub and sink achieves a 1/4" pitch per foot of pipe. At a maximum, as in the bottom picture below, it can roll above the main drain off the top of the wye fitting IF the drain pipe won't be into the concrete at the high end of the drain at the sink. Use a long sweep 90 here if you can. That make sense??

4" pipe pitches at 1/8" per foot of pipe. 3" and 2" pipe pitches at 1/4" per foot.

Check to be sure that the floor drain doesn't need a vent. Most areas will not require a vent, but double check on this.

The washing machine will have a 2" Ptrap and a 30" piece of pipe for a standpipe.

Finally, the inspector will want you to test this system with water to a 10 foot head of pressure so we will need to discuss this, too...O.K.??

Let us know what you think...

MARK

.
Attached Images
  
  Reply With Quote
 
     

Your Answer
Email me when someone replies to my answer
Join Login



Thread Tools Search this Thread
Search this Thread:

Advanced Search
Display Modes
Ask your question or search...



Similar Threads
Basement Rough-in plumbing
(8 replies)
Basement rough in plumbing
(2 replies)
Basement Rough-In plumbing
(8 replies)
basement plumbing rough-in
(2 replies)
Basement Rough in plumbing
(0 replies)

Thread Tools
Show Printable Version Show Printable Version
Email this Page Email this Page
Search this Thread

Advanced Search

Bookmarks





Copyright ©2003 - 2009, Ask Me Help Desk.
All times are GMT -8. The time now is 12:33 AM.