1 Answer
Not your question? Ask your question View similar questions
Add your answer here.Check out some similar questions! Rough in Basement Plumbing Question [ 9 Answers ] Hi, I had my basement roughed in for a shower, toilet and sink. The pipe for the toilet sticks out of the concrete and is 12" from finished wall. There is a 2" PVC pipe behind the toilet that will be located within my framework. I am guessing this is the vent for the toilet and also a wet... Plumbing Schematic Question [ 5 Answers ] I'm in the process of remodeling our half bath. This bathroom originally had a toilet and vanity. I am planning on adding in a neo angle shower and obviously a new toilet and vanity, which will be in different places that they originally were. I have attached a floor plan of our new bathroom... Plumbing question [ 7 Answers ] Can someone tell me if I can tie a new shower drain line.(a second shower) Into an existing kitchen sink drain line?. The kitchen sink line runs about 25FT. To the main drain line, the shower line would be about 10ft. From the main The kitchen line is 1 1/2" shower 2" and the main 3" schedule... Bathroom Plumbing/Venting Question [ 2 Answers ] Hi, I am doing a bathroom remodel and moving the location of the fixtures to make more use of the limited space. The question is, will the room be vented properly based on the drawing I have submitted. I would really rather not have to run a new vent here. Thanks a lot for your help. Plumbing question for new shower [ 1 Answers ] Hi, Looking for some advice on plumbing the drain on a Schluter-Kerdi shower system. I am a pretty confident DIY View more Plumbing questions Search |