Ask Experts Questions for FREE Help!
  Advanced
Register  |  Log in  
   Ask    
 Answer  
  Help  

Ask QuestionsprogressAnswer QuestionsprogressBuild ReputationprogressBecome an Expert
 
Free Answers in 3 Easy Steps

Register Now
3 Steps

At Ask Me Help Desk you can ask questions in any topic and have them answered for free by our experts. To ask questions or participate in answering them you must register for a free account. By registering you will be able to:
  • Get free answers from experts in any of our 300+ topics.
  • Accept money for answers that you provide.
  • Communicate privately with other members (PM).
  • See fewer ads.

Home > Home & Garden > Plumbing   »   Extra line into sewage basin

 
Thread Tools Display Modes
Question
 
 
#1  
Old Jan 18, 2008, 04:00 PM
JoeEdwards44
New Member
JoeEdwards44 is offline
 
Join Date: Jan 2008
Posts: 1
JoeEdwards44 See this member's comment history on his/her Profile page.
Extra line into sewage basin

I am finishing my basement. The builder roughed in the plumbing for a full bath and we have a floor drain that both lead to a typical sewage ejector pump basin. The cover is “gas tight” and has a 2” vent, 2” drainage line and a smaller plug for the electrical lines. I’m told this is completely common.

Here’s my scenario… we’re moving the laundry into the basement and want to add a large utility sink. As it so happens, they are both placed very close to the actual sewage basin, but on the opposite side of a wall from the floor drain. I would like to plump the drain lines from the washer and the sink directly into the basin from the top.

My question is, can I cut another 1-1/2” hole into the top of the basin lid (assume I can find the appropriate gas tight fitting) and drain the washer plus sink directly into the basin? I’m thinking I would extend the 1-1/2” PVC pipe down into the basin and end maybe 2” above the water line.

Is there anything preventing me from doing this? I’m asking both from a code and “proper” perspective and just from the point of - does this make sense? Is there a better way? I would hate to dig up concrete for such a short run.

Thanks - Joe

Reply With Quote
 
     

Answers
 
 
Old Jan 18, 2008, 05:44 PM   #2  
Ultra Member
letmetellu is offline
 
Join Date: Dec 2005
Location: Texas
Posts: 2,191
letmetellu See this member's comment history on his/her Profile page.letmetellu See this member's comment history on his/her Profile page.letmetellu See this member's comment history on his/her Profile page.
You already have a 2" line entering the top so why not cut into that line and install a 2" wye and run 2" to the laundry tub and then reduce down if you have to to go to the drain that is connected to it now.
  Reply With Quote
 
     
 
 
Old Jan 18, 2008, 08:32 PM   #3  
Ultra Member
iamgrowler is offline
 
iamgrowler's Avatar
 
Join Date: Sep 2006
Location: Seattle, WA
Posts: 1,334
iamgrowler See this member's comment history on his/her Profile page.iamgrowler See this member's comment history on his/her Profile page.
Quote:
Originally Posted by JoeEdwards44
I am finishing my basement. The builder roughed in the plumbing for a full bath and we have a floor drain that both lead to a typical sewage ejector pump basin. The cover is “gas tight” and has a 2” vent, 2” drainage line and a smaller plug for the electrical lines. I’m told this is completely common.

Here’s my scenario… we’re moving the laundry into the basement and want to add a large utility sink. As it so happens, they are both placed very close to the actual sewage basin, but on the opposite side of a wall from the floor drain. I would like to plump the drain lines from the washer and the sink directly into the basin from the top.

My question is, can I cut another 1-1/2” hole into the top of the basin lid (assume I can find the appropriate gas tight fitting) and drain the washer plus sink directly into the basin? I’m thinking I would extend the 1-1/2” PVC pipe down into the basin and end maybe 2” above the water line.

Is there anything preventing me from doing this? I’m asking both from a code and “proper” perspective and just from the point of - does this make sense? Is there a better way? I would hate to dig up concrete for such a short run.

Thanks - Joe
Well, "code and "proper" perspective" wise, both drains should be 2" and neither should enter the basin above the vent of the ejector basin or the 'actuating' level of the pumps float switch.
  Reply With Quote
 
     
 
 
Old Jan 19, 2008, 04:48 AM   #4  
Plumbing Expert
massplumber2008 is offline
 
massplumber2008's Avatar
 
Join Date: Jan 2008
Location: Boston, Massachusetts
Posts: 3,640
massplumber2008 See this member's comment history on his/her Profile page.massplumber2008 See this member's comment history on his/her Profile page.massplumber2008 See this member's comment history on his/her Profile page.massplumber2008 See this member's comment history on his/her Profile page.
Iamgrowler...I revised my answer because I forgot that trying to make it easier for homeowner does not make it right!! Thanks for the reminder!!

And LETMETELLU, joe cannot tie into 2" pipe there because it is a pump discharge line!!
  Reply With Quote
 
     

Bookmarks


Thread Tools
Display Modes

 
Similar Sponsors

Similar Threads
Question Asker Forum Answers Last Post
in toilet installation new to ty into existing sewage line daddyftw Plumbing 1 Nov 22, 2007 03:43 PM
Venting at end of sewage line snight1 Plumbing 0 Sep 25, 2007 11:06 AM
How to rewire and extra line to the main phone line at the demarc cdominguez Landline Phones 1 Apr 4, 2007 07:44 PM
Oatey in line vent for sewage pump in the basement fsk Plumbing 11 Nov 28, 2006 04:03 PM
Bath wash basin has extra waste pipe derrickwi Plumbing 1 Oct 23, 2006 12:18 PM




Copyright ©2003 - 2007, Ask Me Help Desk.
All times are GMT -8. The time now is 03:18 PM.