Ask Experts Questions for FREE Help !
Ask
    etonic's Avatar
    etonic Posts: 1, Reputation: 1
    New Member
     
    #1

    May 26, 2008, 02:51 PM
    Installing Closet Flange on Schedule 30 3" pipe - floor height issue
    Hi All,

    I'm finishing a basement bath and have installed the floor (ceramic tile). I have a schedule 30 3" water closet waste pipe rough in. I cut the pipe flush with the tile floor and removed the plastic wrap (so I can install a flange on the outside of the pipe). I went to Lowes and found the only schedule 30 closet flange with the test cap.

    Upon looking at the flange, it looks like it will not sit flush with the floor when installed with the pipe cut even with the tile - looks like 1/4" +/- above the finished floor.

    Should I find another flange? Should I try to trim the pipe shorter (not my preferred idea)?

    Any help from the professionals will be VERY welcome!

    Thanks,
    Mark
    massplumber2008's Avatar
    massplumber2008 Posts: 12,832, Reputation: 1212
    Senior Plumbing Expert
     
    #2

    May 26, 2008, 04:09 PM
    Hi Mark:

    Super easy to just cut that pipe down if you purchase an inside cutter... see pic.

    Here, inside cutter installs into the drill and then as you see, cuts nice and easy.

    A helpful hint here would be to put a rag in the pipe a few inches below the cut in case the bit falls in while working on pipe. Another helpful hint may be to draw the line you want to cut on the inside of the pipe with permanent marker AND then make your cut.

    You may also be able to use an angle grinder or a rotozip angle tool OR SIMILAR and a DIAMOND or metal cutting blade to make the cut you need too... again, just draw the line out on inside of pipe before beginning!

    You can always install an inside TWIST AND SET closet flange (see pic.) but not necessary if can make the cut as easy as I just stated. But if don't have the tools.. this is fine, too!

    Let me know what you think... MARK

    .
    Attached Images
      

Not your question? Ask your question View similar questions

 

Question Tools Search this Question
Search this Question:

Advanced Search

Add your answer here.


Check out some similar questions!

Replacing toilet flange when pipe 2 1/4" below floor [ 4 Answers ]

I've got a 4" cast iron waste line with a slab floor. The pipe is 2 1/4" below the floor surface. The replacement flanges I have found are only 3" long. Is this 3/4" enough for a good seal? Does anyone know if there are longer replacement flanges out there? Thanks

Installing Closet Flange on Concrete floor [ 3 Answers ]

I'm installing a basement bath and have a ceramic floor installed up right around a 4 inch PVC soil drain for my toilet. The floor is laid directly on the concrete. I intend to use a flange that can be glued inside the 4" PVC for the toilet. I'm wondering if the concrete flooor will give enough...

Twist N Set Closet flange on 3" short sweep copper drain pipe [ 2 Answers ]

Hi again, I'm trying to install a 3" Oatey Twist N Set closet flange on 3" short sweep copper drain pipe. The problem I'm having is that the Twist n Set is too long and cannot be inserted all the way due to the curvature of the copper pipe it is fitting into. Secondly, it seems the seal...

Installing a closet flange [ 2 Answers ]

I've had to replace a section of the subfloor in my bathroom because the original construction crew 15 years ago broke the closet flange hammering in nails to seat it on the floor (instead of screwing it down) - it leaked for 15 years under the linoleum until mildew stains came through and I knew I...


View more questions Search