Ask Experts Questions for FREE Help!
Ask    ||    Answer
 
Advanced  
 

Ask QuestionsprogressAnswer QuestionsprogressBuild ReputationprogressBecome an Expert
 
Free Answers in 3 Easy Steps

Register Now
3 Steps

At Ask Me Help Desk you can ask questions in any topic and have them answered for free by our experts. To ask questions or participate in answering them you must register for a free account. By registering you will be able to:
  • Get free answers from experts in any of our 300+ topics.
  • Accept money for answers that you provide.
  • Communicate privately with other members (PM).
  • See fewer ads.

Home > Home & Garden > Plumbing   »   Filling DWV system for test

 
Thread Tools Search this Thread Display Modes
Question
 
 
#1  
Old Jul 21, 2005, 10:45 AM
jamlove's Avatar
jamlove
Junior Member
jamlove is offline
 
Join Date: Jun 2005
Location: Seattle, WA, USA
Posts: 78
jamlove See this member's comment history on his/her Profile page.
Filling DWV system for test

I've reached the most mysterious step in my plumbing project, and I'm hoping you guys can help.

Here in Seattle, we're required to fill the DWV pipes with water all the way to the roof vents for the inspector to view. This is their leakage test.

So I capped every drain opening (sinks, etc) and used a knockout-style closet flange. This makes the whole thing ready for the test fill.

Question is: how exactly do I plug it at the connection to the sewer line, to keep the water from draining?

Is there some cool trick I can use?

My connection from my plastic pipe to the clay sewer pipe is exposed in the hole I dug, and connected with a rubber adapter. I was thinking I could pull the rubber adapter, slip an inflatable stint in, inflate to seal the pipe, then reconnect to the clay pipe. But then when the test is over I'll have to reverse that process, and when I deflate the stint I'll have gallons of water all over the place!

Any way around that, like some kind of remote deflator I could snake down from the cleanout (which is currently about 15 feet upstream from the rubber connector location)? Should I place a large cleanout inline right before the clay pipe? Any other ways I don't know about? Magic foam that dissolves after 2 days?

Thanks very much!

Reply With Quote
 
     

Answers
 
 
Old Jul 22, 2005, 06:54 AM   #2  
Senior Plumbing Expert
speedball1 is offline
 
speedball1's Avatar
 
Join Date: Jan 2003
Location: Sarasota, Fl.
Posts: 18,981
speedball1 See this member's comment history on his/her Profile page.speedball1 See this member's comment history on his/her Profile page.speedball1 See this member's comment history on his/her Profile page.speedball1 See this member's comment history on his/her Profile page.speedball1 See this member's comment history on his/her Profile page.speedball1 See this member's comment history on his/her Profile page.speedball1 See this member's comment history on his/her Profile page.speedball1 See this member's comment history on his/her Profile page.speedball1 See this member's comment history on his/her Profile page.speedball1 See this member's comment history on his/her Profile page.
Pay to call speedball1 for advice ($.95/min)
Call speedball1 via Skype™
Quote:
Originally Posted by jamlove
I've reached the most mysterious step in my plumbing project, and I'm hoping you guys can help.

Here in Seattle, we're required to fill the DWV pipes with water all the way to the roof vents for the inspector to view. This is their leakage test.

So I capped every drain opening (sinks, etc) and used a knockout-style closet flange. This makes the whole thing ready for the test fill.

Question is: how exactly do I plug it at the connection to the sewer line, to keep the water from draining?

Is there some cool trick I can use?

My connection from my plastic pipe to the clay sewer pipe is exposed in the hole I dug, and connected with a rubber adapter. I was thinking I could pull the rubber adapter, slip an inflatable stint in, inflate to seal the pipe, then reconnect to the clay pipe. But then when the test is over I'll have to reverse that process, and when I deflate the stint I'll have gallons of water all over the place!

Any way around that, like some kind of remote deflator I could snake down from the cleanout (which is currently about 15 feet upstream from the rubber connector location)? Should I place a large cleanout inline right before the clay pipe? Any other ways I don't know about? Magic foam that dissolves after 2 days?

Thanks very much!
We test our drainage the same way, by filling the stacks.
You're on the right track. We have two ways we can block off the sewer line for a static water test. One is a inflatable 4" "test ball" we blow up in the house side of the cleanout. The other is a 4" mechanical plug that expands when you turn a wingnut. You don't have to "snake " anything down. Leave the sewer tied in and install the plug/ball on the house side of the cleanout. Then fill the drainage system from the main roof vent. When the inspection's over pull the plug and the extra water wiil drain out in the sewer.
good luck on the inspection, Tom
  Reply With Quote
 
     

Your Answer
Email me when someone replies to my answer
Join Login





Thread Tools Search this Thread
Search this Thread:

Advanced Search
Display Modes

 
Similar Sponsors


Thread Tools
Show Printable Version Show Printable Version
Email this Page Email this Page

Similar Threads
washer just keeps on filling
(9 replies)
Need help filling the W4
(3 replies)
what's the diff between diaelectric test and insulation test
(1 replies)
filling the radiators + high pressure in hot water system... => ???
(6 replies)
How do I increase H2O pressure on well system with a water filtration system?
(2 replies)

Search this Thread

Advanced Search

Bookmarks

Sponsors



Copyright ©2003 - 2009, Ask Me Help Desk.
All times are GMT -8. The time now is 03:14 PM.