Ask Experts Questions for FREE Help!
  Advanced
Register  |  Log in  
   Ask    
 Answer  
  Help  

Ask QuestionsprogressAnswer QuestionsprogressBuild ReputationprogressBecome an Expert
 
Free Answers in 3 Easy Steps

Register Now
3 Steps

At Ask Me Help Desk you can ask questions in any topic and have them answered for free by our experts. To ask questions or participate in answering them you must register for a free account. By registering you will be able to:
  • Get free answers from experts in any of our 300+ topics.
  • Accept money for answers that you provide.
  • Communicate privately with other members (PM).
  • See fewer ads.

Home > Home & Garden > Plumbing   »   running new water lines in slab construction

 
Thread Tools Display Modes
Question
 
 
#1  
Old Oct 11, 2006, 10:30 AM
miguelito3218
Junior Member
miguelito3218 is offline
 
Join Date: Aug 2006
Posts: 55
miguelito3218 See this member's comment history on his/her Profile page.
running new water lines in slab construction

If you want to replace the water lines in a slab, one story house, can you just go up into the attic and come down to each fixture?

When going from an existing copper line to cpvc, can you use one of those male adapters like you would use on a shower body or water heater?

Also, water heater is fed by a 1/2 line, which only services on bath and kithen. I'd like to in the future run a 3/4 line to the water heater, then a 3/4 line to service all the hot water fixtures, in the future. Because i am currently building a new bathroom, can i run the 3/4 line to the new bathroom, then just cap it off in the attic until I get to redoing the kitchen and other bath in the attic? (so it would be 1/2 feeding the water heater with 3/4 outlet until i get around to replacing the feed to 3/4)

Could i just tap off the 3/4 line to 1/2 for each fixture, or do i have to tap off once and feed my other fixtures off of the 1/2 line? Thanks for all the help from this site.

Reply With Quote
 
     

Answers
 
 
Old Oct 11, 2006, 06:17 PM   #2  
New Member
dmkegs is offline
 
Join Date: Oct 2006
Location: Pacific Northwest
Posts: 23
dmkegs See this member's comment history on his/her Profile page.
Quote:
Originally Posted by miguelito3218
If you want to replace the water lines in a slab, one story house, can you just go up into the attic and come down to each fixture?

When going from an existing copper line to cpvc, can you use one of those male adapters like you would use on a shower body or water heater?

Also, water heater is fed by a 1/2 line, which only services on bath and kithen. I'd like to in the future run a 3/4 line to the water heater, then a 3/4 line to service all the hot water fixtures, in the future. Because i am currently building a new bathroom, can i run the 3/4 line to the new bathroom, then just cap it off in the attic until I get to redoing the kitchen and other bath in the attic? (so it would be 1/2 feeding the water heater with 3/4 outlet until i get around to replacing the feed to 3/4)

Could i just tap off the 3/4 line to 1/2 for each fixture, or do i have to tap off once and feed my other fixtures off of the 1/2 line? Thanks for all the help from this site.
You need to check code in your area, but a 3/4 will feed 4 fixtures without you being scalded in the shower when some one flushes the toilet. As far as put your new lines in the attic remeber that they must be protected from freezing. I would take care of the supply to the hot water tank first. Run 3/4 with 3/4X1/2 tees to the present and future fixtures
  Reply With Quote
 
     
 
 
Old Oct 11, 2006, 06:52 PM   #3  
Junior Member
miguelito3218 is offline
 
Join Date: Aug 2006
Posts: 55
miguelito3218 See this member's comment history on his/her Profile page.
thanks! but when i carry the new 3/4 hot line through the attic, i need to feed more than 4 fixtures. I would need to feed 7 or 8 (2 baths plus kitchen sink, plus washer). So how would i go about doing that? the 3/4 line would be direct from the hot water heater.
  Reply With Quote
 
     
 
 
Old Oct 11, 2006, 07:40 PM   #4  
Ultra Member
iamgrowler is offline
 
iamgrowler's Avatar
 
Join Date: Sep 2006
Location: Seattle, WA
Posts: 1,334
iamgrowler See this member's comment history on his/her Profile page.iamgrowler See this member's comment history on his/her Profile page.
If you permit this job you may run into problems with the plumbing inspector.

Most jurisdictions do not allow water piping to be run in unheated spaces, which in most cases, means an attic is out of the question.

If you were to run the piping overhead, you would need to drill it through the rafters, which will likely be frowned upon by the building inspector, you will then need to insulate the rafter bays and sheet them in with plywood -- Which probably presents a whole host of other problems if the rafters aren't substantial enough to support the added weight.

If this is merely a hot water issue, are the bathrooms close enough together to install a Rinnai tankless hot water heater?

This would certainly beat undermining the rafters in your attic just to get the new system past the plumbing and building inspectors.
  Reply With Quote
 
     
 
 
Old Oct 12, 2006, 08:12 AM   #5  
Junior Member
miguelito3218 is offline
 
Join Date: Aug 2006
Posts: 55
miguelito3218 See this member's comment history on his/her Profile page.
thanks again! I live in florida so i dont think the heating issue is a problem...could i not just run them along top of the rafters rather than drill through? thanks!
  Reply With Quote
 
     
 
 
Old Oct 12, 2006, 08:59 AM   #6  
Senior Plumbing Expert
speedball1 is offline
 
speedball1's Avatar
 
Join Date: Jan 2003
Location: Sarasota, Fl.
Posts: 14,873
speedball1 See this member's comment history on his/her Profile page.speedball1 See this member's comment history on his/her Profile page.speedball1 See this member's comment history on his/her Profile page.speedball1 See this member's comment history on his/her Profile page.speedball1 See this member's comment history on his/her Profile page.speedball1 See this member's comment history on his/her Profile page.speedball1 See this member's comment history on his/her Profile page.speedball1 See this member's comment history on his/her Profile page.speedball1 See this member's comment history on his/her Profile page.
Pay to call speedball1 for advice ($.95/min)
Call speedball1 via Skype™
"If you want to replace the water lines in a slab, one story house, can you just go up into the attic and come down to each fixture? "
Yes, This is called "overhead piping"and we use it when we pipe our condos here in Florida.

"When going from an existing copper line to cpvc, can you use one of those male adapters like you would use on a shower body or water heater?"
Yes you may use a threaded male to threaded female adapter to convert from copper to CPVC.

I'd like to in the future run a 3/4 line to the water heater, then a 3/4 line to service all the hot water fixtures, in the future. Because i am currently building a new bathroom, can i run the 3/4 line to the new bathroom, then just cap it off in the attic until I get to redoing the kitchen and other bath in the attic? (so it would be 1/2 feeding the water heater with 3/4 outlet until i get around to replacing the feed to 3/4)"
Increasing the hot water feed to 3/4" is a very good idea. You may run a 3/4"main and cap it off untill needed. A 3/4" hot water branch to each fixture is overkill and I'll address that later n this post.

"Could i just tap off the 3/4 line to 1/2 for each fixture, or do i have to tap off once and feed my other fixtures off of the 1/2 line?"
As I stated,"overkill". Code allows three fixtures off a 1/2" branch fed by a 3/4" main. However I would run a dedicatel 1/2" supply to the toilet. That saves someone in the shower from getting parboiled when the toilet's flushed. Regards, Tom
  Reply With Quote
 
     

Bookmarks


Thread Tools
Display Modes

 
Similar Sponsors

Similar Threads
Question Asker Forum Answers Last Post
Sizing Water Lines KevinG Plumbing 3 Sep 8, 2006 04:12 PM
New Construction Slab Issue! tobonyx Plumbing 1 Aug 2, 2006 06:33 AM
Vanity Water Lines mmangrum Plumbing 5 Nov 16, 2005 05:30 AM
Draining water lines before soldering dsimms Plumbing 2 Mar 4, 2005 08:46 PM
Air in water lines goldponies Plumbing 1 Nov 15, 2004 12:50 PM




Copyright ©2003 - 2007, Ask Me Help Desk.
All times are GMT -8. The time now is 06:03 PM.