Ask Experts Questions for FREE Help!
  Advanced
Register  |  Log in  
   Ask    
 Answer  
  Help  

Ask QuestionsprogressAnswer QuestionsprogressBuild ReputationprogressBecome an Expert
 
Free Answers in 3 Easy Steps

Register Now
3 Steps

At Ask Me Help Desk you can ask questions in any topic and have them answered for free by our experts. To ask questions or participate in answering them you must register for a free account. By registering you will be able to:
  • Get free answers from experts in any of our 300+ topics.
  • Accept money for answers that you provide.
  • Communicate privately with other members (PM).
  • See fewer ads.

Home > Home & Garden > Plumbing   »   Basement bathtub - roughin

 
Question Tools Search this Question Display Modes
Question
 
 
#1  
Old Jan 28, 2008, 06:01 PM
nayte
New Member
nayte is offline
 
Join Date: Jan 2008
Posts: 1
nayte See this member's comment history on his/her Profile page.
Basement bathtub - roughin

I am finishing my basement, and will be installing a two or three piece tub / shower. My basement has been roughed in. There is a 2 inch pipe sticking out of the cement floor for the tub drain. Should there be a morter patch that I need to chip out in order to properly install the drain and overflow?

Also, do I need to install aqua board behind the tub and shower, or can the 3 piece shower simply be attached directly to the studs?

thanks

Reply With Quote
 
     

Answers
 
 
Old Jan 28, 2008, 10:10 PM   #2  
speedball1
Plumbing Expert
speedball1 is offline
 
speedball1's Avatar
 
Join Date: Jan 2003
Location: Sarasota, Fl.
Posts: 12,717
speedball1 See this member's comment history on his/her Profile page.speedball1 See this member's comment history on his/her Profile page.speedball1 See this member's comment history on his/her Profile page.speedball1 See this member's comment history on his/her Profile page.speedball1 See this member's comment history on his/her Profile page.speedball1 See this member's comment history on his/her Profile page.speedball1 See this member's comment history on his/her Profile page.speedball1 See this member's comment history on his/her Profile page.
Pay to call speedball1 for advice ($.95/min)
Call speedball1 via Skype™
Quote:
Should there be a morter patch that I need to chip out in order to properly install the drain and overflow?
Yes! Tap around and see if it isn't just"skim cement " over the tub dap-out. If not, then you were roughed in for a shower and you will have to make a 12" square hole for the tub waste to connect to the trap raiser. The trap raiser shouls center about 15 1/2" off the wall and 1 1/2" off the front plate to pick up the average tub.
Quote:
do I need to install aqua board behind the tub and shower, or can the 3 piece shower simply be attached directly to the studs?
A plumbers job is done when he installs the shower valve, pan and drain. but I'm hoping one of our other experts will pick up on this and answer. Regards, Tom
  Reply With Quote
 
     
 
 
Old Jan 29, 2008, 03:34 AM   #3  
massplumber2008
Plumbing Expert
massplumber2008 is offline
 
massplumber2008's Avatar
 
Join Date: Jan 2008
Location: Boston, Massachusetts
Posts: 2,414
massplumber2008 See this member's comment history on his/her Profile page.massplumber2008 See this member's comment history on his/her Profile page.massplumber2008 See this member's comment history on his/her Profile page.
Speedball1 has got you started....sounds like a shower rough in to me as well. Dig out around pipe and see if it heads into a 2" p-trap...may need to move slightly and reduce pipe size to fit to a tub (see Speed's numbers....then measure on your tub or get a specification sheet from the supplier that sold it to you and check that for rough in measurements).

Then, install the tub and shower walls AGAINST the studs. If you want a superior job--->>> who doesn't --->>> Then I would set this tub in a modified thinset mortar or a structolite gypsum base to reduce creaking/crackling inherent in these type of tubs.

Usually takes 2-50lb bags minimum. Easy to do...(no plastic needed on floor as floor is cement)...just mix and pour in the footprint that your tub makes at the floor...will need to look under tub before starting and see how much height you need...usually slopes toward drain...add 1-2 inches higher than the bottom of tub and then lower unit and squish out the excess by shifting/shaking unit down and into place. I have mixed a couple batches a little thick and had to step in to finally lower unit to floor. I promise you it will be worth the hassle!!!

BUT..you do not have to do the mortar/structolite...not everyone does it...OR some just do it for shower bases...we do it for anything acrylic or fiberglass...even whirlpools!!

Hey, any more questions//let us know. Good luck.

If answer was helpful, please RATE THE ANSWER. Thank you.
  Reply With Quote
 
     


Question Tools Search this Question
Search this Question:

Advanced Search
Display Modes

 
Similar Sponsors

Similar Questions
Question Asker Topic Answers Last Post
basement roughin mriko45 Plumbing 5 Apr 8, 2007 08:28 PM
basement roughin finish mriko45 Construction 1 Apr 7, 2007 04:05 PM
Basement Roughin cdx2 Plumbing 7 Feb 15, 2007 06:38 AM
Basement Roughin 3 Peice ? kldom Plumbing 5 Nov 27, 2006 01:31 PM
Basement Bathroom Roughin doityourself1 Plumbing 5 Dec 26, 2005 06:11 AM




Copyright ©2003 - 2007, Ask Me Help Desk.
All times are GMT -8. The time now is 08:51 PM.

Content Relevant URLs by vBSEO 3.0.0 RC6 © 2006, Crawlability, Inc.