Ask Experts Questions for FREE Help!
Answer   ||    Advanced Search

Ask your question or search...
International Sites: Nederlandse experts vragen
User Name 
Password 
Join   Forgot password? 

Home > Home & Garden > Plumbing   »   Adding bath drain in concrete for existing half bath

Question
 
 
#1  
Old Oct 5, 2007, 05:57 PM
soundmanwill
New Member
soundmanwill is offline
 
Join Date: Oct 2007
Posts: 2
soundmanwill See this member's comment history on his/her Profile page.
Adding bath drain in concrete for existing half bath

I want to turn a half bath into a full bath in my basement. Currently the washer and dryer along with the water heater are in the half bath along with the commode and sink. I want to add a bath tub and the lay out of the room is such that the tub installation would probably require less work if it were placed where the sink is currently located and try to utilize the current sink drain. I was going to move the sink and vanity to where the washer and dryer currently are use the plumbing for the washer for the sink. My concern and question is this: The bath is on a slab and it appears that the upstairs sink shares the drain pipe for the downstairs sink. Should I build a small riser to place the tub on to accommodate the drain and if I try to use the drain the sink is currently using, will there be a drainage problem from the upstairs sink? Would it be better to cut a channel in the slab to install the tub drain than to try to build that small riser?

I can’t see the route of the drain because it disappears into the bottom plate that is sitting on the slab

Any suggestions?

Reply With Quote
 
     

Answers
 
 
Old Oct 5, 2007, 06:47 PM   #2  
Heating and Air Conditioning Expert
letmetellu is offline
 
Join Date: Dec 2005
Location: Texas
Posts: 2,849
letmetellu See this member's comment history on his/her Profile page.letmetellu See this member's comment history on his/her Profile page.letmetellu See this member's comment history on his/her Profile page.
If you can make it work you can connect the tub drain up in a space of about 2 1/2 inches about the concrete, so a riser would not have to be very high. All though the upstairs drain connected into the tub drain might not be up to code it will still work, there might be a chance of the trap water being sucked out of the trap and odor could escape but I think it would be worth a chance.
  Reply With Quote
 
     

Your Answer
Email me when someone replies to my answer
Join Login



Thread Tools Search this Thread
Search this Thread:

Advanced Search
Display Modes
Ask your question or search...



Similar Threads
Adding a tub to a half bath
(1 replies)
Adding a bathroom or add a shower to existing half bath?
(0 replies)
Adding washer to half bath
(0 replies)
Adding shower to half bath downstairs
(1 replies)
Adding a shower to half bath*rough-in question
(24 replies)

Thread Tools
Show Printable Version Show Printable Version
Email this Page Email this Page
Search this Thread

Advanced Search

Bookmarks





Copyright ©2003 - 2009, Ask Me Help Desk.
All times are GMT -8. The time now is 04:04 PM.