Ask Experts Questions for FREE Help!
  Advanced
Register  |  Log in  
   Ask    
 Answer  
  Help  

Ask QuestionsprogressAnswer QuestionsprogressBuild ReputationprogressBecome an Expert
 
Free Answers in 3 Easy Steps

Register Now
3 Steps

At Ask Me Help Desk you can ask questions in any topic and have them answered for free by our experts. To ask questions or participate in answering them you must register for a free account. By registering you will be able to:
  • Get free answers from experts in any of our 300+ topics.
  • Accept money for answers that you provide.
  • Communicate privately with other members (PM).
  • See fewer ads.

Home > Home & Garden > Plumbing   »   3" toilet stack is not level comming out of cement floor

 
Question Tools Search this Question Display Modes
Question
 
 
#1  
Old Dec 9, 2007, 11:11 AM
CamG
New Member
CamG is offline
 
Join Date: Dec 2007
Posts: 3
CamG See this member's comment history on his/her Profile page.
3" toilet stack is not level comming out of cement floor

Hi,
I just finished chipping the cement away and cutting my stack down to the proper height to mount my flange, but unfortunately the 3" vertical stack is not level coming out of the cement floor.

When I dry fit my flange it is lower on one side by about a 1/2".

Any Idea on what my options are?

I don't suppose the wax ring will make up that much of a difference would it?

Thanks,
Cam

P.s this is a great site !!!

Reply With Quote
 
     

Answers
 
 
Old Dec 9, 2007, 01:56 PM   #2  
speedball1
Plumbing Expert
speedball1 is offline
 
speedball1's Avatar
 
Join Date: Jan 2003
Location: Sarasota, Fl.
Posts: 13,188
speedball1 See this member's comment history on his/her Profile page.speedball1 See this member's comment history on his/her Profile page.speedball1 See this member's comment history on his/her Profile page.speedball1 See this member's comment history on his/her Profile page.speedball1 See this member's comment history on his/her Profile page.speedball1 See this member's comment history on his/her Profile page.speedball1 See this member's comment history on his/her Profile page.speedball1 See this member's comment history on his/her Profile page.
Pay to call speedball1 for advice ($.95/min)
Call speedball1 via Skype™
Sorry my friend but you're gonna hafta bust out the cement and strighten up that pipe. I wish i could be more helpful with a miracle fix but I can't. Good luck, Tom
  Reply With Quote
 
     
 
 
Old Dec 9, 2007, 02:13 PM   #3  
CamG
New Member
CamG is offline
 
Join Date: Dec 2007
Posts: 3
CamG See this member's comment history on his/her Profile page.
Thank you very much for the quick response.

Would my best bet be to bust up the concrete, dig down to the elbow, try to bend the main stack straight, support it, and then back fill with gravel and cement ?

I measured down the inside of the pipe and I have about 14" to the elbow. Do you think that is enough to be able to bend the stack ?

Thanks again,
Cam
  Reply With Quote
 
     
 
 
Old Dec 9, 2007, 05:59 PM   #4  
plumberjames83
Junior Member
plumberjames83 is offline
 
plumberjames83's Avatar
 
Join Date: Nov 2007
Location: BIRMINGHAM , AL
Posts: 100
plumberjames83 See this member's comment history on his/her Profile page.
you might break something bust all the wat though and cut and reglue your closet bend thats your best bet
  Reply With Quote
 
     
 
 
Old Dec 10, 2007, 06:41 AM   #5  
CamG
New Member
CamG is offline
 
Join Date: Dec 2007
Posts: 3
CamG See this member's comment history on his/her Profile page.
Hi,
Thanks for the help.
I broke up a good amount of the floor and found the original problem

The reason the vertical stack is not level is because the the main horizontal pipe is on an angle. It is sloped down towards the main pipe that exits the house.

So my new problem is, If I cut the horizontal pipe and put a new elbow on it, will I still be off level because of the original slope of this horizontal pipe ? I think somthing is going to have to bend somwhere...

Thanks
Cam
  Reply With Quote
 
     
 
 
Old Dec 10, 2007, 06:51 AM   #6  
ballengerb1
Home Repair & Remodeling Expert
ballengerb1 is offline
 
Join Date: Dec 2006
Location: Wheaton, Illinois, USA
Posts: 8,613
ballengerb1 See this member's comment history on his/her Profile page.ballengerb1 See this member's comment history on his/her Profile page.ballengerb1 See this member's comment history on his/her Profile page.ballengerb1 See this member's comment history on his/her Profile page.ballengerb1 See this member's comment history on his/her Profile page.ballengerb1 See this member's comment history on his/her Profile page.ballengerb1 See this member's comment history on his/her Profile page.ballengerb1 See this member's comment history on his/her Profile page.
You may need to make your cut at the main and replace the entire horizpntal pipe level. If you were to switch to an Oatey Twist-N-Set flange you might find that you can make up that 1/2" out of level, I'm not 100% sure but if it doesn't work you can retrun the part, about $18.
  Reply With Quote
 
     


Question Tools Search this Question
Search this Question:

Advanced Search
Display Modes

 
Similar Sponsors

Similar Questions
Question Asker Topic Answers Last Post
toilet flange above floor level JamesO Plumbing 58 Jun 27, 2008 02:17 AM
concrete slab:Toilet flange below floor level xn51 Plumbing 2 Sep 17, 2007 07:53 PM
How do you install an acrylic shower receptor using "setting bed" cement? romark Plumbing 3 Apr 13, 2007 06:21 AM
Installing toilet over new hardwood floors - flange is now below floor level lgbolton Plumbing 1 Oct 14, 2006 09:03 AM
toilet flange below the floor level- URGENT Nicole4 Plumbing 3 Jun 29, 2005 02:35 PM




Copyright ©2003 - 2007, Ask Me Help Desk.
All times are GMT -8. The time now is 08:13 PM.

Content Relevant URLs by vBSEO 3.0.0 RC6 © 2006, Crawlability, Inc.