    Full bathroom venting for finished basement.
    I had my basement plumbed for a full bath during construction. So, I have a 2" pvc lav pipe coming out of concrete, next in line is the toilet pipe sticking out, then the shower/tub drain, it runs to the main under the slab. I have a 2" pvc vent that is capped and in between joists above and I know it runs straight up and through roof. So, I want to verify that I can tie the lav's trap into that vent line and that would vent all three fixtures/traps (dry, wet, and wet). Is that correct?

    Thanks in advance!
    tigerz98's Avatar
    tigerz98 Posts: 3, Reputation: 1
    New Member
     
    #2

    Apr 22, 2013, 08:27 AM
    The existing vent pipe goes up through three stories (including attic). Is it all right that I will need to run my connection horizontally about 12 feet to connect to it? Or can I initially run it at 45 degrees (up between studs and concrete wall), then horizontally, parallel to joist, the remaining 6 ft to capped pipe?
    massplumber2008's Avatar
    massplumber2008 Posts: 12,832, Reputation: 1212
    Senior Plumbing Expert
     
    #3

    Apr 22, 2013, 10:24 AM
    Hi Tigerz98

    Correct, tie the lavatory drain/trap into the 2" drain coming out of the floor and then run that 2" pipe over to the capped 2" "future vent" in the ceiling.

    In terms of running the vent, just make sure that the pipe gets hung every 4 feet and that it pitches approximately 1/8" to 1/4" per foot of pipe from the future vent toward the drain pipe so that condensation/rain water can flow down the drain via gravity, OK?

    Questions? Let me know.

    Mark
    tigerz98's Avatar
    tigerz98 Posts: 3, Reputation: 1
    New Member
     
    #4

    Apr 23, 2013, 06:48 AM
    Thanks Mark!
    massplumber2008's Avatar
    massplumber2008 Posts: 12,832, Reputation: 1212
    Senior Plumbing Expert
     
    #5

    Apr 23, 2013, 12:45 PM
    I replied to your private message... see my reply. Thank you!

Not your question? Ask your question View similar questions

 

Question Tools Search this Question
Search this Question:

Advanced Search

Add your answer here.


Check out some similar questions!

Venting for new basement bathroom? [ 10 Answers ]

We're adding a basement bathroom. Cement has been cut out with wet saw and trench dug, have access to 3" PVC that exits through cinder clock and ties into main sanitary line under yard. Tied to this drain now: Directly above - kitchen sink (dbl, w/ disposal) - 1.5" PVC vertical, maybe 3'...

Venting a basement bathroom [ 4 Answers ]

I am putting a bathroom into a basement with no existing rough in. What is the best way to vent and how far can it run? The bath is on the wall that runs up to the garage and near the front door. The opposite direction is the back deck. I would have to run across the joist to get to...

Basement bathroom venting [ 32 Answers ]

I could use a bit of advice. MN location. I have to break up concrete and install a basement bathroom. I am putting a sink on the opposite side of the toilet and the shower will Be almost between the two and off to the side with a half wall next to shower. 3"Stack is next to shower and...

Venting a basement bathroom [ 7 Answers ]

I have a rough in for a full bath in my basement. House was built in 2000 in Pa. Two story colonial. I can locate two vents from the 1st floor bath. One 2" vent right of the WC drain and one 1.5" off the shower on the first floor. There is a 2nd floor bath over the first. I can hear the 2nd...

Venting basement bathroom [ 5 Answers ]

Hi all, First time here. I am finishing my basement in Milwaukee. The washer dumps into a sink which has a 2" line that y's into a 4" drain that is stubbed up from the slab. This is not the main stack. The 4" ties to the main 4" about 12' away under the slab. The 4" stub rises from the...


View more questions Search