Ask Experts Questions for FREE Help!
  Advanced
Register  |  Log in  
   Ask    
 Answer  
  Help  

Ask QuestionsprogressAnswer QuestionsprogressBuild ReputationprogressBecome an Expert
 
Free Answers in 3 Easy Steps

Register Now
3 Steps

At Ask Me Help Desk you can ask questions in any topic and have them answered for free by our experts. To ask questions or participate in answering them you must register for a free account. By registering you will be able to:
  • Get free answers from experts in any of our 300+ topics.
  • Accept money for answers that you provide.
  • Communicate privately with other members (PM).
  • See fewer ads.

Home > Home & Garden > Interior Home Improvement   »   finishing concrete floor with moisture issue

 
Thread Tools Display Modes
Question
 
 
#1  
Old Mar 19, 2008, 07:30 PM
phildesign
New Member
phildesign is offline
 
Join Date: Sep 2005
Posts: 9
phildesign See this member's comment history on his/her Profile page.
finishing concrete floor with moisture issue

Our home recently got wet when a storm of the century hit the region. I don't know where the water came from since I wasn't home but I believe it came from the ground.

Three months later I'm trying to finish the floors, ideally leaving the concrete exposed. Having done moisture tests it appears our basement is encountering floor failure. The calcium chloride moisture test results ended up being 3.75, 4.25 and 4.25 for the three rooms. (I'd imaging they'll be quite a bit lower in the summer)

Other than grinding down the floor, laying down an epoxy layer, covering with a thin layer of polymer concrete and then staining and sealing. Is there a different, less costly approach that might look nice and work with the moisture levels? I got quoted 10k do do the work on a 1000sf floor. Ideally I'd love to spend half of that.

thanks for your help.

Reply With Quote
 
     

Answers
 
 
Old Mar 20, 2008, 01:53 PM   #2  
Full Member
the1unv is offline
 
the1unv's Avatar
 
Join Date: Feb 2008
Posts: 282
the1unv See this member's comment history on his/her Profile page.
How long has it been since the floor was wet ? If the storm hit 3 months ago how long did the water sit there? It can take a while for the moisture to disappear. I would suggest running a dehumidifier and waiting a couple more months. you may find the moisture level dropping by 50%. If you can get the moisture level to drop you should be able to have a 1000sf done for about $2500.00......less than 1/2 of that if you do it yourself. I did a 825sf floor for $500.00
Mike
  Reply With Quote
 
     
 
 
Old Mar 20, 2008, 07:44 PM   #3  
New Member
phildesign is offline
 
Join Date: Sep 2005
Posts: 9
phildesign See this member's comment history on his/her Profile page.
Quote:
Originally Posted by the1unv
How long has it been since the floor was wet ? If the storm hit 3 months ago how long did the water sit there? It can take a while for the moisture to disappear. I would suggest running a dehumidifier and waiting a couple more months. you may find the moisture level dropping by 50%. If you can get the moisture level to drop you should be able to have a 1000sf done for about $2500.00......less than 1/2 of that if you do it yourself. I did a 825sf floor for $500.00
Mike
Thanks for the suggestion Mike,
It's been three months since I started to dry out the basement. The water never was really standing much; the carpet that was on top of the tiling acted as a wick but there wasn't enough water to puddle up..
I've heard that sometimes running a dehumidifier draws moisture through the concrete and can counteract the drying. Have you heard of that before?
  Reply With Quote
 
     
 
 
Old Mar 20, 2008, 10:28 PM   #4  
Full Member
the1unv is offline
 
the1unv's Avatar
 
Join Date: Feb 2008
Posts: 282
the1unv See this member's comment history on his/her Profile page.
It may draw some moisture throgh the concrete........it has to come out. I have never had an issue of drying being counteracted by a dehumidifier. You can check your moisture on your own to check drying progress. Take a 2' x 2' piece of plastic, lay it on the floor, duct tape it down tight around the edges, leave for 24 hours and check. If it is dry,,,,good, If it is wet under the plastic you still have moisture problem.
Mike
  Reply With Quote
 
     
 
 
Old Mar 23, 2008, 04:46 PM   #5  
New Member
phildesign is offline
 
Join Date: Sep 2005
Posts: 9
phildesign See this member's comment history on his/her Profile page.
Quote:
Originally Posted by the1unv
It may draw some moisture throgh the concrete........it has to come out. I have never had an issue of drying being counteracted by a dehumidifier. You can check your moisture on your own to check drying progress. Take a 2' x 2' piece of plastic, lay it on the floor, duct tape it down tight around the edges, leave for 24 hours and check. If it is dry,,,,good, If it is wet under the plastic you still have moisture problem.
Mike
thanks Mike,
mind me asking what product you used on your floor?
  Reply With Quote
 
     


Thread Tools
Display Modes

 
Similar Sponsors

Similar Threads
Question Asker Forum Answers Last Post
concrete finishing price woodrowsimon Construction 3 Nov 5, 2007 01:52 PM
Floor warped & moisture in crawl space curwin Construction 3 Oct 21, 2007 05:45 PM
Preventing moisture and mildew from coming through a shed floor. Selah Interior Home Improvement 6 Aug 28, 2007 05:35 AM
Finishing my basement vent stack planning issue mlenfert Plumbing 0 Jul 24, 2007 10:12 AM
finishing a second floor kent_brown1 Construction 1 Sep 1, 2006 09:27 AM




Copyright ©2003 - 2007, Ask Me Help Desk.
All times are GMT -8. The time now is 07:07 AM.