At Ask Me Help Desk you can ask questions in any topic and have them answered for free by our experts. To ask questions or participate in answering them you must register for a free account. By registering you will be able to:
  • Get free answers from experts in any of our 300+ topics.
  • Accept money for answers that you provide.
  • Communicate privately with other members (PM).
  • See fewer ads.

Home > Home & Garden > Interior Home Improvement   »   Question on install of basement shower, tiled walls, prefab base

 
Thread Tools Display Modes
Question
 
 
#1  
Old Jan 14, 2007, 08:11 PM
mtnbkr
Junior Member
mtnbkr is offline
 
Join Date: Jan 2007
Posts: 75
mtnbkr See this member's comment history on his/her Profile page.
Question on install of basement shower, tiled walls, prefab base

I'm in the process of installing a 36in sq shower in my basement. Please let me know if this process is correct:

1) frame out surround, 2x4s, spaced 36in for base to fit, drain and plumbing run
2) put shower base (w/ drain installed) down onto concrete (do I need to put some mortar or anything down below this?)
3) put cement board up to height of where tiling will end, then butt together w/ greenboard for area above tiling, tape seams (is this right, I'm not sure where the cement board should end, will regular self adhesive fiberglass tape work? Also, how high should tiling go?)
4) install tiling up wall
5) seal grout
6) caulk between bottom of tile and shower base

done?


Thanks!

Reply With Quote
 
     

Answers
 
 
Old Jan 15, 2007, 08:13 AM   #2  
Senior Plumbing Expert
speedball1 is offline
 
speedball1's Avatar
 
Join Date: Jan 2003
Location: Sarasota, Fl.
Posts: 14,572
speedball1 See this member's comment history on his/her Profile page.speedball1 See this member's comment history on his/her Profile page.speedball1 See this member's comment history on his/her Profile page.speedball1 See this member's comment history on his/her Profile page.speedball1 See this member's comment history on his/her Profile page.speedball1 See this member's comment history on his/her Profile page.speedball1 See this member's comment history on his/her Profile page.speedball1 See this member's comment history on his/her Profile page.speedball1 See this member's comment history on his/her Profile page.
Pay to call speedball1 for advice ($.95/min)
Call speedball1 via Skype™
2) put shower base (w/ drain installed) down onto concrete (do I need to put some mortar or anything down below this?)

If the base has no support and "gives" a bit when you put weight on iut then I would bed the base at the time of installation.
My expertise stops at the plumbing end so I'm kicking this thread over to experts that have more knowledge the I. Regards, Tom
  Reply With Quote
 
     
 
 
Old Jan 17, 2007, 09:05 AM   #3  
Junior Member
dclynch is offline
 
Join Date: Feb 2005
Posts: 148
dclynch See this member's comment history on his/her Profile page.
3) - You should put a vapor barrier behind the cement board. 6 mil poly sheeting works well. It should overlap the lip of the shower base. The cement board should extend at least as high as the water will likely splash - about six feet. The cement board seams should be taped and then "mudded" with thinset. They make special fiberglass tape for this. It is heavier duty than the tape for drywall. The taping can be done in advance or at the time of installation. If done in advance, be sure to avoid creating a "speed bump." Only use dry mix thinset. Do not use mastic or premix thinset in a wet area.

6) Many people also suggest caulking the corner joint. You can grout, but be sure to keep an eye on it over time, as this is a place grout can fail.

Good luck.
  Reply With Quote
 
     
 
 
Old Jan 18, 2007, 12:37 PM   #4  
Junior Member
mtnbkr is offline
 
Join Date: Jan 2007
Posts: 75
mtnbkr See this member's comment history on his/her Profile page.
Thanks for the info. For the 6mil poly sheet, do I just staple to the studs, then hang the cement board over it? Then just make sure the edge of it hangs over the shower base...should I caulk it down or something?
  Reply With Quote
 
     
 
 
Old Jan 18, 2007, 03:10 PM   #5  
Junior Member
dclynch is offline
 
Join Date: Feb 2005
Posts: 148
dclynch See this member's comment history on his/her Profile page.
Stapled to the studs is fine. Put the cement board up over it. After tiling, you can trim the excess before caulking the base-tile joint. (Or you can trim earlier, doesn't matter.)
  Reply With Quote
 
     

Bookmarks


Thread Tools
Display Modes

 
Similar Sponsors

Similar Threads
Question Asker Forum Answers Last Post
Shower enclosure base in basement commoditywatcher Plumbing 5 Dec 31, 2006 06:20 AM
prefab shower base for basement leslie3 Plumbing 6 Oct 18, 2006 07:32 AM
Removing shower base in basement CNR Plumbing 6 Feb 8, 2006 05:38 AM
Installing a shower base in the basement Thad Plumbing 17 Feb 3, 2006 12:52 PM




Copyright ©2003 - 2007, Ask Me Help Desk.
All times are GMT -8. The time now is 04:51 AM.