| thanks for the reply.. I do have one more question. I had to break out the concrete to run some plumbing. the area i broke out was no wider that 4 inches but many feet long,and i am laying 12"x12' tiles.. some areas where i poured concrete back in isnt perfect, but pretty good. slightly dipped in a few places, will it be ok just to run the thin set over those ares and let it do the filling for those areas? |