Basement stud walls

I am beginning the process of finishing our walkout basement. One of the first challenges I have come across in laying out the walls is a number of plumbing and gas lines right at the top of the concrete exterior walls feeding the main and second story. The lines will prevent me from attaching the top plates for my stud walls to the joists above.

Is there a workaround outside of having the pipes re-plumbed?

All of the research I have done indicates that you do not want to attach the 2x4 stud walls to the concrete exterior walls for any reason.

Reply With Quote
 
     

Answers
 
 
Old Dec 27, 2005, 01:15 PM   #2  
Senior Member
skiberger is offline
 
Join Date: Nov 2005
Location: pennsylvania
Posts: 563
skiberger See this member's comment history on his/her Profile page.
Frame your wall with the top plate shy of the above piping so you have a completed framed wall. Attach 2x material, say 16" long, to the foundation about every other stud. Plumb the wall, then measure from the plumbed wall to the 2x secrured to the foundation. Cut another 2x piece the distance from the attched wood on the foundation to the stud. Take in account the 1 1/2" piece on the foundation and the width of the studs your using and add that to the measurement. You'll secure the framed wall to the foundation wall w/ this piece of wood. If you have a poured concrete foundation, Red Heads work well if block, Tapcons also work well.
  Reply With Quote
 
     
 
 
Old Dec 27, 2005, 02:02 PM   #3  
New Member
tallensprings is offline
 
Join Date: Dec 2005
Posts: 5
tallensprings See this member's comment history on his/her Profile page.
Distance to plumbing rough-in

Quote:
Originally Posted by skiberger
Frame your wall with the top plate shy of the above piping so you have a completed framed wall. Attach 2x material, say 16" long, to the foundation about every other stud. Plumb the wall, then measure from the plumbed wall to the 2x secrured to the foundation. Cut another 2x piece the distance from the attched wood on the foundation to the stud. Take in account the 1 1/2" piece on the foundation and the width of the studs your using and add that to the measurement. You'll secure the framed wall to the foundation wall w/ this piece of wood. If you have a poured concrete foundation, Red Heads work well if block, Tapcons also work well.
Thanks for the quick reply!

If I understand your post, the stud wall will be out (depending on where the wall plumbs to) appoximately 5 1/2" from the concrete foundation wall > 1 1/2" stud attached to foundation + 3 1/2" stud wall + 1/2" drywall. This creates another problem in that the rough-in shower/tub and stool drain lines for the bathroom will be thrown off by that extra 1 1/2".

Is there any way I can maintain the proper spacing in the bathroom to avoid expensive plumbing re-work or special offset toilet?
  Reply With Quote
 
     
 
 
Old Dec 27, 2005, 03:09 PM   #4  
Senior Member
skiberger is offline
 
Join Date: Nov 2005
Location: pennsylvania
Posts: 563
skiberger See this member's comment history on his/her Profile page.
I like to keep at least an 2" space from the foundation to the back side of the studded wall for air circulation. The 2x material your securing to the foundation are scrap peices. They dont have to be full length studs. Your using these as an anchors so the wall is attached to these w/ a peice of 2x nailed to the side of the stud then to the 1 1/2 side of the foundation mounted piece.
If you have to keep the studs tight against the foundation b/c of the plumbing you'll be OK. If all else fails just surface mount firring strips to the foundation in the bath area where the roughed-in plumbing may be a factor. Place plastic over the foundation then mount the fir strips. Ridgid insluation between, then durorock over the studs in the shower/tub area & moisture resistant drywall over the other fir strips area. If I knew how to draw on the computer it would be easier to understand.
  Reply With Quote
 
     
 
 
Old Dec 27, 2005, 07:47 PM   #5  
Über Member
labman is offline
 
Join Date: Feb 2003
Location: Northern US
Posts: 10,646
labman See this member's comment history on his/her Profile page.labman See this member's comment history on his/her Profile page.labman See this member's comment history on his/her Profile page.labman See this member's comment history on his/her Profile page.labman See this member's comment history on his/her Profile page.labman See this member's comment history on his/her Profile page.
Using 5/4 pressure treated lumber in place of the 2X would work and save you the 1/2 inch. Won't hurt to have pressure treated against the masonry.
  Reply With Quote
 
     

Your Answer
Email me when someone replies to my answer
Join Login



Thread Tools Search this Thread
Search this Thread:

Advanced Search
Display Modes
Ask your question or search...



Similar Threads
New basement bathroom floors/walls
(5 replies)
Stud wall: Do I need cross pieces?
(6 replies)
Tearing down 2 walls
(1 replies)
Metal vs. Wood stud walls
(2 replies)
Movable Walls
(0 replies)

Thread Tools
Show Printable Version Show Printable Version
Email this Page Email this Page
Search this Thread

Advanced Search

Bookmarks





Copyright ©2003 - 2009, Ask Me Help Desk.
All times are GMT -8. The time now is 06:47 PM.